Norfolk County Hall
Five-floor refurbishment
This was a five-floor refurbishment project installing range of ductwork up to throughout, from basement to the roof. We used galvanised sheet metal and fire rated ductwork to execute this project.
Throughout this project, we fitted bespoke ductwork both internally and externally with a wide variety of sizes and shapes to suit a particularly difficult workface. The fire-painted ductwork was also required to be installed on the outside walls.
This job exceeded the client’s requirements with a neat and tidy finish, this was tackled at the same time as complying with the ever-evolving Covid guidelines of the time to get the job done.